THE IMPLEMENTATION OF WILD BOOTSTRAP BASED ON MM-GM6 ESTIMATOR IN THE PRESENCE OF HETEROSCEDASTIC ERRORS AND HIGH LEVERAGE POINTS
THE IMPLEMENTATION OF WILD BOOTSTRAP BASED ON MM-GM6 ESTIMATOR IN THE PRESENCE OF HETEROSCEDASTIC ERRORS AND HIGH LEVERAGE POINTS
Authors : P. I. Dalatu
Category : Open Access Volume (Issue) : 6(1) Date Uploaded : 19th September 2020